The Alcami Suite 160 upfit project consisted of a new FDL Lab, Autoclave, Airlock, and High Potent Lab along with an open office. The scope of this project consisted of interior demolition along with some exterior storefront removal. Both the Autoclave and High PotentLab have an epoxy floor along with clean room features. A key challenge was working beside active tenants and coordinating all work along with the required electrical, mechanical, and process piping tie-ins for the existing system.
Archives: Portfolios
Medpharm
This cGMP facility supports the expansion of research and development and small-scale manufacturing capabilities. The design and layout of the space were driven by the process of entering the building, gowning up, moving into the Clean Corridors to access the Clean Rooms, and then moving prepared materials into the warehouse for global and domestic shipping. The project scope included office space, a Quality Control Lab, and Clean Rooms (ISO 8) for process and manufacturing.
Alcami Microsphere
5,000 SF GMP cleanroom construction for small-scale manufacturing process. This project includes Level 2 control areas and ISO 7 classifications. Packaging and Staging areas are interlocked with the Production areas. Cleaning, weighing, and gowning areas complete the support spaces of this manufacturing facility. Critical milestones included the construction of a containment pit and an interstitial platform for large equipment support and accessibility. The space was constructed in what was formerly general office space.
Halo Health
Tenant fit-up for a concierge medical practice on the ground floor of a 36-year-old building. MYBC coordinated with the design team to resolve unforeseen conditions uncovered during demolition. MYBC worked with the mechanical contractor and mechanical engineer to redesign the mechanical layout that was proposed as existing to remain to accommodate an 11′ ceiling height without sacrificing the design intent. The project team also faced challenges with material availability.McDonald York worked with the electrical contractor and electrical supply house to track down alternate light fixtures to expedite the schedule.
Triangle Orthopaedics Surgery Center
BASF Engagement Center
The BASF Engagement Center Project consisted of 5,400 SF of demoed space where we removed old furniture, lab casework, and equipment. The finished Engagement Center went back together with new lighting consisting of 3’ pendant lights and wall sconces, Armstrong LVT floors, fresh paint throughout the center, and new millwork in the corridor. We rerouted the mechanical systems and added a VAV to accommodate the new needs of the exhibition space. The walk-off mat and wood siding at the vestibule that wrapped the inside and outside of the entrance was replaced. The client added a new AV system in the space that would allow groups to enjoy the newly renovated space. The landscape, patio, and sidewalks were updated to include a water feature and sitting area outside the center.
Pairwise Golden Belt Project
This was a unique project that included the transformation of 31,809 SF of a historic tobacco warehouse with exposed wood columns, beams, and floors into a complete plant science lab with a chef’s kitchen. The new lab space supported the complete life cycle of plant science from media/seed to the plate. Lab space included research lab, freezer farm, tissue culture lab with BSL2 room, and growth chambers. We coordinated and supervised the installation of 2 owner supplied growth chambers. We also installed a new generator to back all lab space and, due to grade changes, we installed a retaining wall to create a level platform.
The Woodburn Condominiums
Reconstruction and expansion of 3 new condominium buildings with a total of 32-units totaling 24,580 SF. Work included new utilities, fire protection, and MEP systems. Architectural finishes included #2 oak hardwood floors, marble tile, ceramic tile showers, French casements windows, custom cabinets with quartzite countertops, and a painted brick veneer. The sitework package consisted of a new storm drain system, utilities, concrete sidewalk, parking lot, and landscaping.
NCSU Poe Hall
2500 SF of classroom and office up-fit. Work consisted of demo and abatement of finishes including framing, Sheetrock, and flooring. Install consisted of new interior framing, Sheetrock, window units, paint, and flooring. New doors and frames with hardware installed. A new HVAC system in the ceiling was completed along with electrical light fixtures and ACT ceiling grid. Challenges on the project included working in an occupied building and fifth-floor construction zone. Noise played a role in the timing of certain trades along with access to the space and liquidated damages on a tight time frame. A highlight of the project is having MYBC work in a higher education space for the first time at NCSU.
Spaces
First–generation office build-out to include collaborative and shared working environments. Much of the construction was glass assemblies to share natural light between spaces but suites also included more private conference and collaboration rooms. Finished adjacent spaces will allow for multiple tenants to share amenities such as a large coffee station, reception areas, restrooms, larger meeting areas, private phone rooms, and administrative/copy areas.