We’re Hiring! Join the McDonald York Team and be a part of Building the Triangle. View Current Openings
X

Spreedly

This tenant upfit in a new office building included multiple glass RACO offices, break room, glass garage door installations in the conference room, a warm and inviting fireplace art installation, and custom light fixtures. 

Anthem Call Center

Interior demolition to the second floor of a 4story office building. The scope was for new tenant occupancy. Demolition included the removal of partitions, finishes, millwork, ceilings, and equipment. Modification to the HVAC system, electrical, plumbing, and fire protection system to support the new interior layout. 45,000 SF office upfit to follow included open area workspace for calls, closed offices, lounge, conference rooms, large dining room, and reception area. In an effort to expedite the schedule on this project, the Preconstruction activities coincided with demolition and permitting. This overlap created efficiency and early procurement activities.

SEPI at One Glenwood

This class A office upfit on the 6th floor of the newly completed, One Glenwood building in Downtown, Raleigh includes open office space, reception area, break room, and conference rooms. The space was designed to be engaging and inviting to users. Glass curtain walls were used throughout the space to allow for abundant natural light and great views of Raleigh. Other office features include a coffee bar, private phone booths, and team collaboration spaces. The project was completed on a tight schedule. Coordination with the shell contractor was key in the beginning stages to achieve this goal. 

Allscripts

Allscripts first-generation office fit up in a newly constructed high-rise building. The project included a new cafeteria complete with a full kitchen and seating area. McDonald York provided preconstruction services including preliminary budgeting, design review, and option pricing support, value engineering suggestions and implementation, and CD review budget pricing. The preconstruction deliverables included a fully transparent final GMP estimate and supporting bid comparison information with at least three bidders for each trade.

Trilliant Headquarters

This project was demolition and upfit of the entire third floor to new office space with server room in an existing, occupied office building. The project scope included the renovation of the reception area, conference rooms, huddle rooms, phone rooms, and open workstations. 

United Way

This project was an upfit of a second-generation office space for the relocation of  United Way of the Greater Triangle. The office is located on the second floor of an office building in the center of Research Triangle Park. The project included an open new reception area with connecting break area, two phone rooms, conference rooms, a training room, and open office space. 

Avid Solutions

The Avid Solutions project entailed the complete demolition of existing office space and the full upfit of new office space. The new space includes open office areas, glass front offices, meeting rooms, workrooms, a break area, and a new IT room. The main challenges to this project were working in an occupied building and an accelerated schedule to meet the client’s required move-in dates. 

NC Community Foundation

Interior upfit consisting of demolition, wall rebuild, and new finishes. Specialty finishes selected for the completion of the project were focused on the re-use of materials from North Carolina which included re-claimed wood accent walls, reclaimed barn doors, and reclaimed wood wrap on break room islands and columns. This project was completed in an occupied building. 

CBRE Charter Square Building

Office upfit for CBRE’s new Raleigh Headquarters in downtown Raleigh’s Charter Square Building. The scope of this project included conference rooms, focus rooms, an open office space with rising desks, a board room, and a lobby/reception area.  Notable features include high-end wood veneer finishes imported from Japan, ALUR linear glass throughout the office, and state-of-the-art audio visual components installed in each of the conference rooms and board room. 

Precision BioSciences

10,000 SF renovation of existing space to office space and cleanroom lab manufacturing facility. Renovated space consists of process rooms, solution preparation rooms, and cold storage chamber for materials to be stored at various temperatures. Also includes general warehouse space constructed to eventually be converted into additional cleanroom space. All compliant with current Good Manufacturing Practices (cGMP).